The big water tank is now in place, the excitingly named Rotex Sanicube, although I can't help but point out that it's not really a cube.
In other news, a well-dressed engineer type was spotted in the hole in the road doing something this morning, so hopefully we're now almost connected - though we need to wait for yet another man to connect the two pipes together that are inside the gas box (with a meter).
It seems that every joint in the pipe is handled by a different company, with another one involved to dig up the road! It's close though...
Our poor heating engineers are finishing off down in the heating room, which, thanks to our dodgy plumbing, isn't always the nicest place to be (careful observers will spot the main waste pipe exiting the house under the boiler). This leads to a terrible dilemma .. how many flushes do you need to get your poops definitively out of the house? It's a tricky one, particularly given that everyone seem to have the gastro.. I mean, is one enough? Two? Or maybe two positions the poop right in the wrong place... and flushing six or seven times just makes it look suspicious.
Luckily there are no photos this time...